St. Catherine, Winnipeg

  • Scope: High-end installation for two luxury units featuring 2×2 floor tile, 2×4 wall slabs, and integrated hydronic heated floors throughout, complete with a full Schluter waterproofing system, curbless showers, linear drains, and precision mitered edges with epoxy grout.
  • Timeline: 260 hours for 2 people.
  • Location: St. Catherine, Winnipeg, Manitoba
  • General Contractor: Frank Manfredi