Mr. Lube, Winnipeg

Project Info:

  • Scope: Commercial restroom upgrade featuring full wall tile replacement, precision floor tile repairs, and durable epoxy grouting for maximum longevity.
  • Timeline: 10 hours.
  • Location: Mr. Lube, Winnipeg, MB